50 MW West Raynham.
Fakenham, Norfolk
Introduction
50 MW West Raynham.
A 50 MW large-scale solar development producing 46,745 MWh annually and reducing emissions by 30,000 tonnes through complete EPC delivery.
Industry
Utility-scale
Location
Fakenham, Norfolk
Panel description
High-efficiency commercial PV modules
Number of panels
92,593
Installation time
Scheduled around your operations
System size
50 MWp
About the project
The West Raynham Solar Farm is a 50 MW utility-scale solar project in the UK, delivering approximately 46,745 MWh of clean electricity annually and reducing CO₂ emissions by around 30,000 tonnes per year.
The project included full civil, electrical, and mechanical works, covering site preparation, access roads, foundations, trenching, and security infrastructure. Electrical works involved complete AC and DC system installation, including cabling, inverters, transformers, earthing, and full testing and commissioning. Mechanical works covered pile driving, mounting structure installation, and photovoltaic module installation.
Overall, the project represents a fully integrated, high-performance solar development built to rigorous engineering, safety, and environmental standards, contributing significantly to the UK’s renewable energy capacity.

Project management
“This installation was managed end to end by the SolarTech UK commercial team, from initial survey and design through installation, commissioning and ongoing performance monitoring.”
SolarTech UK Commercial Team
The stats
System output.
A 50 MW large-scale solar development producing 46,745 MWh annually and reducing emissions by 30,000 tonnes through complete EPC delivery.
Video overview
Installation at 50 MW West Raynham.
Video overview is being prepared for this project.
Let’s discuss your commercial project.
Reduce costs and carbon emissions with SolarTech.
Gallery
Contact us
Make an enquiry.
Tell us about your roof or land. We will assess it honestly, including when solar is not the right answer.